As part of the City’s multi-year rehabilitation plan, they had to update a water main that was built in 1897. Because of the pipe's age, there were no as-built drawings of the main, only a couple of stick drawings. These didn't have any information the project team could use. Additionally, pipes of this age often used lead solder to hold together joints. The main also passed underneath several businesses, a double row of railroad tracks, a regional trail and the Menomonie River. The team used a robotic CCTV camera to scope out the bends in the water main running beneath the river. This process helped the team determine which method they would use to rehabilitate it.
The project decided to use trenchless technology to rehabilitate the water pipe. The process used a Class IV fully structural cured-in-place pipe (PIPP) liner. This technology seals up pipe joints, preventing any potential lead solder from coming into contact with the water. Trenchless technology also allowed the project team to complete the project without disrupting the public. Businesses, restaurants, bike and walking paths remained in use because the project didn't require digging up the street.
Project
Wauwatosa Water Main Rehabilitation
Location
Wauwatosa, Wis.
Client
City of Wauwatosa
Features
Services