The Minnesota Department of Transportation (MnDOT) needed to replace the eastbound Highway 62 bridge over Interstate 35W due to heavy traffic loads and issues with merging. But they couldn’t close the bridge down during construction.
The project team designed an 865-foot-long, three-lane, curved bridge, which was constructed in stages to avoid traffic disruption.
Project
Eastbound TH 62 Over TH 35W and TH 121
Location
Richfield, Minn.
Client
Minnesota Department of Transportation (MnDOT)
Features